Private Network Check Readiness - TeckNexus Solutions

Trump’s Permitting Order: What It Means for Telecom & Broadband Deployment

President Trump’s executive order to modernize environmental permitting may streamline U.S. infrastructure projects—but it notably omits telecom and broadband. Industry experts say pole attachments, state permitting rules, and access to federal lands remain critical hurdles. While the order could bring indirect benefits, real telecom reform still requires sector-specific solutions.
Trump’s Permitting Order: What It Means for Telecom & Broadband Deployment

President Trump’s latest executive order seeks to modernize and accelerate the environmental permitting process for infrastructure projects in the United States. While the move has drawn attention across sectors, its implications for the telecom industry, particularly broadband deployment—remain uncertain. Despite its broad scope, the order does not explicitly reference telecom or broadband, leaving many in the industry wondering how much of a difference it will actually make.

What Trump’s Permitting Reform Order Means for the U.S.


The executive order outlines several steps to improve the speed, transparency, and coordination of the federal permitting process. It directs agencies to:

  • Maximize the use of technology and digital tools
  • Accelerate decision-making timelines
  • Improve interagency coordination
  • Establish a new Permitting Innovation Center to design and test prototype tools for permitting

The order emphasizes reducing delays and cutting down on paper-based application systems. It names roads, bridges, power plants, mines, and factories as the types of infrastructure projects targeted by the reform—telecom is conspicuously absent.

Why Telecom and Broadband Providers Are Anxious About the Order

Though the order doesn’t mention telecom or broadband infrastructure, it arrives at a time when network providers have been vocal about how cumbersome and outdated permitting processes hinder broadband rollouts—especially for 5G and FWA deployments.

According to the Rural Wireless Association (RWA), NEPA (National Environmental Policy Act) reviews have become costly and time-consuming. In filings with the FCC, the group argued that these delays often outweigh the actual environmental impact, especially for small wireless deployments with minimal footprint.

Many telecom builds—such as new towers, fiber routes, or small cell installations—require various environmental permits, even when the impact is low. Streamlining those processes would be beneficial, in theory. But the executive order’s lack of telecom-specific language makes its application unclear.

Gaps in the Order: Broadband Permitting Challenges Still Unsolved

While the executive order outlines a broad vision for permitting modernization, it stops short of addressing the specific, well-documented roadblocks that broadband providers routinely face. The telecom industry has long argued that streamlining infrastructure approvals must include concrete action on the bottlenecks unique to digital network deployments—especially those that directly delay last-mile connectivity and rural access expansion.

1. Pole Access Still a Major Obstacle for Broadband Rollout

The most glaring omission from the executive order is any reference to pole attachments, a long-standing bottleneck in broadband deployment.

“The biggest concern we have heard about network expansion from ISPs concerns access to utility poles,” said Blair Levin, a former FCC official and current policy adviser at New Street Research.

This is a significant issue. Telecom companies often need to attach fiber or small cells to utility poles—many of which are controlled by electric utilities or municipalities. Delays, high rental fees, or disputes over access can derail broadband timelines.

While the FCC has created a rapid response team to resolve pole attachment disputes, 23 states and Washington D.C. manage their own pole attachment rules, creating a patchwork of regulations that complicates deployment efforts.

2. State and Federal Permitting Barriers Remain for Telecom Projects

Another critical gap in the executive order is the lack of attention to federal lands and state or local permitting laws. Many telecom builds traverse public lands, and rules governing those areas can vary significantly. Broadband providers have flagged these as some of the most difficult and time-consuming permits to obtain.

“Federal permitting is only half the battle,” Levin noted. “The EO doesn’t cover the layers of regulation that broadband providers face from states and municipalities.”

This omission significantly limits the EO’s immediate utility for accelerating telecom deployments.

Could Trump’s Permitting Reforms Indirectly Help Broadband?

Despite the lack of specificity, industry analysts believe the order could have indirect, long-term benefits for broadband and telecom:

  • Digital permitting platforms: If the new Permitting Innovation Center produces tech solutions, those could trickle down to telecom projects.
  • Policy momentum: The EO could set the stage for more telecom-specific reforms by drawing attention to permitting delays across sectors.
  • FCC engagement: Policymakers, including FCC Commissioner Brendan Carr, may leverage the EO’s principles to drive industry-focused reforms.

Levin noted that while the executive order “is not targeted at the principal permitting concerns of broadband network providers,” the initiative may help spur innovation in permitting processes that eventually benefit telecom.

Telecom Industry Responds with Cautious Optimism to Permitting Reform

Telecom trade associations welcomed the EO with measured optimism.

“Anything that boosts the efficiency, ease, and speed of the permitting process on federal, state, or Tribal lands—we’re for,” said a spokesperson from the Wireless Internet Service Providers Association (WISPA).

Incompas CEO Chip Pickering went a step further, linking the order to America’s global competitiveness in areas like AI and data infrastructure: “The EO directly addresses America’s urgent need to outpace global competitors in the critical AI race. It supports the buildout of high-speed broadband, energy grids, and data centers—all of which are foundational to deploying next-gen AI systems.”

Telecom Reform Still Lags Despite Permitting Order Momentum

The executive order may improve permitting in a general sense, but it doesn’t resolve some of the most entrenched challenges facing broadband deployment:

  • Pole access and rental disputes
  • State-by-state variance in permitting laws
  • Permitting delays on Tribal and federal lands
  • Transparent, fair fee structures for infrastructure sharing

While broadband builds might see some efficiency gains from general improvements in how permits are processed, significant regulatory gaps remain.

In July 2024, the FCC proposed measures to streamline environmental and historic preservation reviews for small cell installations. But with that proposal withdrawn earlier this year by Commissioner Carr, and nothing new introduced since, the telecom sector remains in a holding pattern when it comes to meaningful permitting reform.

Trump’s Permitting Reform: A Start, But Not a Breakthrough for Broadband

President Trump’s executive order signals a push to modernize and digitize federal permitting systems. It could create a foundation for future reforms and innovation in how infrastructure gets approved. However, its lack of telecom specificity, absence of solutions for pole attachments, and failure to address state and local regulatory hurdles means that its real impact on broadband deployment is still limited—for now.

For the telecom industry, the executive order is best viewed as a small step forward rather than a sweeping solution. It offers the potential for improvement but stops short of delivering the targeted reforms that ISPs and wireless providers have long sought.


Recent Content

Google will pay a US$35.8 million (A$55 million) penalty and change how it structures Android default search agreements with Australian carriers and OEMs. The Australian Competition and Consumer Commission (ACCC) alleged that Googles contracts with Telstra and Optus from December 2019 to March 2021 blocked rival search engines on carrier-sold Android devices via platform-wide default settings and revenue-sharing incentives. Google admitted the conduct likely lessened competition and agreed to court-enforceable undertakings to remove restrictions that mandated Google Search as the exclusive, out-of-the-box option across search access points (browser defaults, widgets, and in-phone settings).
The 4.44.94 GHz range offers the cleanest mix of technical performance, policy feasibility, and global alignment to move the U.S. ahead in 6G. Midband is where 6G will scale, and 4 GHz sits in the sweet spot. A contiguous 500 MHz block supports wide channels (100 MHz+), strong uplink, and macro coverage comparable to C-Band, but with more spectrum headroom. That translates into better spectral efficiency and a lower total cost per bit for nationwide deployments while still enabling dense enterprise and edge use cases.
Palo Alto Networks PAN-OS 12.1 Orion steps into this gap with a quantum-ready roadmap, a unified multicloud security fabric, expanded AI-driven protections and a new generation of next-generation firewalls (NGFWs) designed for data centers, branches and industrial edge. The release also pushes management into a single operational plane via Strata Cloud Manager, targeting lower operating cost and faster incident response. PAN-OS 12.1 automatically discovers workloads, applications, AI assets and data flows across public cloud and hybrid environments to eliminate blind spots. It continuously assesses posture, flags misconfigurations and exposures in real time and deploys protections in one click across AWS, Azure and Google Cloud.
Beijing’s first World Humanoid Robot Games is more than a spectacle. It is a live systems trial for embodied AI, connectivity, and edge operations at scale. Over three days at the Beijing National Speed Skating Oval, more than 500 humanoid robots from roughly 280 teams representing 16 countries are competing in 26 events that span athletics and applied tasks, from soccer and boxing to medicine sorting and venue cleanup. The games double as a staging ground for 5G-Advanced (5G-A) capabilities designed for uplink-intensive, low-latency, high-reliability robotics traffic. Indoors, a digital system with 300 MHz of spectrum delivers multi-Gbps peaks and sustains uplink above 100 Mbps.
stc 5G powered the Esports World Cup with 1,295 antennas and 285 MHz spectrum, delivering broadcast-grade uplink, low latency, and reliable performance.
More than $14 billion has been invested across the CBRS stacklicenses, RAN, devices, infrastructure, sensors, and software. Over 420,000 CBRS radio nodes (CBSDs) are in service. The device ecosystem is broad: Apple and Samsung ship n48-capable handsets; industrial and FWA suppliers support n48 CPEs and routers; Ericsson, Nokia, Samsung, JMA Wireless and others provide radio and DAS. This is not a pilot; it is production infrastructure. Refarming would force replacement or retuning of hundreds of thousands of base stations and millions of end devices, plus upgrades to SAS integrations and enterprise control planes.
Whitepaper
Explore how Generative AI is transforming telecom infrastructure by solving critical industry challenges like massive data management, network optimization, and personalized customer experiences. This whitepaper offers in-depth insights into AI and Gen AI's role in boosting operational efficiency while ensuring security and regulatory compliance. Telecom operators can harness these AI-driven...
Supermicro and Nvidia Logo
Whitepaper
The whitepaper, "How Is Generative AI Optimizing Operational Efficiency and Assurance," provides an in-depth exploration of how Generative AI is transforming the telecom industry. It highlights how AI-driven solutions enhance customer support, optimize network performance, and drive personalized marketing strategies. Additionally, the whitepaper addresses the challenges of integrating AI into...
RADCOM Logo
Article & Insights
Non-terrestrial networks (NTNs) have evolved from experimental satellite systems to integral components of global connectivity. The transition from geostationary satellites to low Earth orbit constellations has significantly enhanced mobile broadband services. With the adoption of 3GPP standards, NTNs now seamlessly integrate with terrestrial networks, providing expanded coverage and new opportunities,...

Download Magazine

With Subscription

Subscribe To Our Newsletter

Private Network Awards 2025 - TeckNexus
Scroll to Top

Private Network Awards

Recognizing excellence in 5G, LTE, CBRS, and connected industries. Nominate your project and gain industry-wide recognition.
Early Bird Deadline: Sept 5, 2025 | Final Deadline: Sept 30, 2025